New Service Connections |
|
Water Connection Fees
Standard 3/4"Tap
| |
Capital Recovery Fee |
Tap Fee |
Meter Fee |
Security Deposit |
Backflow Preventer |
Total |
|
On existing Butts County road with water mains already in place |
$825.00 |
$500.00 |
|
$75.00 |
$25.00 |
$1,425.00 |
|
On existing Butts County road during installation of first water mains |
|
$350.00 |
|
$75.00 |
$25.00 |
$450.00 |
|
In a Butts County subdivision where the developer has already installed water taps |
$825.00 |
|
$100.00 |
$75.00 |
$25.00 |
$1,025.00 |
|
Monroe County lots in Harbour Shores subdivision |
$1,075.00 |
|
$100.00 |
$75.00 |
$25.00 |
$1,275.00 |
1" Tap
|
Capital Recovery Fee |
Tap Fee |
Meter Fee |
Security Deposit |
Backflow Preventer |
Total |
|
On existing Butts County road with water mains already in place |
$1,375.00 |
$750.00 |
|
$75.00 |
$40.00 |
$2,240.00 |
|
On existing Butts County road during installation of first water mains |
|
$600.00 |
|
$75.00 |
$40.00 |
$715.00 |
1 1/2" Tap
|
Capital Recovery Fee |
Tap Fee |
Meter Fee |
Security Deposit |
Backflow Preventer |
Total |
|
On existing Butts County road with water mains already in place |
$2,725.00 |
$850.00 |
|
$75.00 |
Purchased separately |
$3,650.00 |
|
On existing Butts County road during installation of first water mains |
|
$700.00 |
|
$75.00 |
Purchased separately |
$775.00 |
2" Tap
|
Capital Recovery Fee |
Tap Fee |
Meter Fee |
Security Deposit |
Backflow Preventer |
Total |
|
On existing Butts County road with water mains already in place |
$4,375.00 |
$1,050.00 |
|
$75.00 |
Purchased separately |
$5,500.00 |
|
On existing Butts County road during installation of first water mains |
|
$900.00 |
|
$75.00 |
Purchased separately |
$975.00 |
3" Tap
|
Capital Recovery Fee |
Tap Fee |
Meter Fee |
Security Deposit |
Backflow Preventer |
Total |
|
On existing Butts County road with water mains already in place |
$8,525.00 |
$10,250.00 |
|
$75.00 |
Purchased separately |
$18,850.00 |
|
On existing Butts County road during installation of first water mains |
|
$10,100.00 |
|
$75.00 |
Purchased separately |
$10,175.00 |
Sizes Larger Than 3"
|
Prices are for existing roads with water |
Capital Recovery Fee |
Tap Fee |
Security Deposit |
Backflow Preventer |
Total |
|
4" |
$13,625.00 |
Fee for 3" tap + added material costs |
$75.00 |
Purchased separately |
Dependent on material costs |
|
6" |
$27,250.00 |
Fee for 3" tap + added material costs |
$75.00 |
Purchased separately |
Dependent on material costs |
|
8" |
$43,575.00 |
Fee for 3" tap + added material costs |
$75.00 |
Purchased separately |
Dependent on material costs |
|
10" |
$63,650.00 |
Fee for 3" tap + added material costs |
$75.00 |
Purchased separately |
Dependent on material costs |
|
|